The Navy aircraft carrier acquisition program responds to future challenges and requirements with a two-track strategy. The near-term track of this strategy is CVN 77, the tenth NIMITZ Class and the first carrier of the 21st Century. The post-Cold War carrier force structure includes 12 aircraft carriers, 11 in the active force and one in the reserves. To maintain this force structure, the Navy must begin construction of its next carrier, CVN-77, by fiscal year 2002 in order to complete it by fiscal year 2008. Completion in this year is necessary to replace the last conventional carrier, USS Kitty Hawk (CV-63), that will still be in service in the active force. Kitty Hawk will be 47 years old at that time.
The Fiscal Year 1998 budget request would have funded CVN-77 in the traditional manner by means of advance procurement funding of $695.0 million in fiscal year 2000, with the remaining balance of $4.5 billion included in fiscal year 2002. The previous nuclear aircraft carrier, CVN-76, was authorized in fiscal year 1995. The seven year gap between CVN-76 and CVN-77 exceeded any construction interval between individual carriers in the previous three decades, which was the six years between USS Carl Vinson (CVN-70), a fiscal year 1974 ship, and USS Theodore Roosevelt (CVN-71), a fiscal year 1980 ship.
In 1997 Newport News proposed what it termed a "Smart Buy" procurement strategy for the next Nimitz class carrier, under which a portion of CVN-77 funding originally budgeted for 2002 would be incrementally funded in FY98 through FY01. The company claimed that this advanced funding would reduce the cost of the carrier by an estimated $600 million by ensuring a strong supplier base and preserving essential shipbuilding skills that might otherwise be lost during the construction gap between CVN-76 and CVN-77.作者: 克里斯Chris 時間: 07-9-4 18:50
續:
The FY1998 budget request included no funding for CVN 77, a posture supported by the House. However, the Senate authorized $345.0 million for procurement and construction of components for the CVN 77 aircraft carrier, authorized the Secretary of the Navy to enter into a contract or contracts with the carrier shipbuilder for such purposes, and authorized $35.0 million for research, development, test, and evaluation of technologies that have potential for use in the CVN 77. The Senate directed the Secretary of Defense to structure the procurement of the CVN 77 so that the carrier is acquired for an amount not to exceed $4.6 billion.
The conferees supported construction of the CVN 77 and encouraged the Secretary of Defense to make available up to $295.0 million in fiscal year 1998 and to include in the FYDP accompanying the fiscal year 1999 budget request the funding necessary to achieve the savings required to remain within the $4.6 billion cost limitation.作者: 克里斯Chris 時間: 07-9-4 18:51
CVN-77 ANNUAL FUNDING (年資金)
[In millions of dollars]
-------------------------------------------------------------------------------
Fiscal year--
------------------------------------------------------- Total
1998 1999 2000 2001 2002
-------------------------------------------------------------------------------
FYDP........... 0 0 695 0 4,505 5,200
Senate......... 345 170 875 135 3,074 4,600
--------------------------------------------------------------
Difference..... +345 +170 +180 +135 -1,430 -600
-------------------------------------------------------------------------------作者: 克里斯Chris 時間: 07-9-4 18:52
續:
Responding to FY 1998 Congressional action, the Navy substantially revised the Department's SCN funding profile for CVN 77 in the FY 1999 budget submission. Including the $48.7 million provided by the FY 1998 Appropriations Act, the Department applied a total of $241 million above the advance procurement for nuclear components, for non-nuclear advance procurement and advance construction of components in FYs 1998 through 2000. With assistance in top line accommodation from the Office of the Secretary of Defense and the Office of Management and Budget, this accelerated the full funding of CVN 77 one year to FY 2001. The resultant profile, which shortens the production gap between CVN 76 and CVN 77, will provide significant industrial base benefits and savings while balancing other shipbuilding priorities.
CVN-77 will provide a transition from the Nimitz-class nuclear aircraft carrier to the next-generation CV(X). As such, CVN-77 is a candidate for development, evaluation, and incorporation of a range of advanced technologies and acquisition reform initiatives which, not only could result in lower life cycle costs, but could also set the standard by which further improvements in the application of advanced technologies and acquisition initiatives to the design and construction of the CV(X) will be measured. Technology innovations fielded in CVN 77, which are targeted to achieve a 15% reduction in Operation and Support Costs, will also be backfit as feasible in the other nine ships of the NIMITZ Class through the Carrier Improvement Plan, and forward fit to achieve cost savings and risk reduction in the next class, CVX. The FY 1999 budget request included $38 million in RDT&E funding to support incorporation of critical transition technologies in CVN 77.作者: 克里斯Chris 時間: 07-9-4 18:52
CVN-77假想圖:
作者: 克里斯Chris 時間: 07-9-4 18:54
有關CVN-77之特色概念設計:
Features of CVN 77 Concept Design
1 Passive Jet Blast Deflector: Redesigns and new materials mean reduced maintenance costs.
2 Island Designs: Improve flight deck access and reduce signature and electronic self-interference.
3 Signature Reduction: Curved flight deck edges, enclosed antenna farms, smaller islands and internal aircraft elevators add up to maximum stealth.
4 Aircraft Pit Stop: Semi-automated refueling and servicing in a new configuration and deck location provides faster, more efficient airwing pit stops and requires fewer people.
5 Hanger Bay: New designs reduce clutter.
Other features incorporated in this concept include:
Manpower Reductions: Technology, space rearrangement, operational procedure changes, advanced sensor technologies and condition-based maintenance systems all allow for a smaller, specially-trained crew.
Reconfigurable Spaces: Life-of-the-ship modular construction designs provide flexibility and reduce cost.
Expanded Bandwidth: More onboard and offboard capability gives the ship a communications edge.
Zonal Electrical Distribution Systems: Isolate the potential for problems and minimizes the effect on the rest of the ship.
Automation Insertion: Material movement devices, semi-autonomous, gravity compensated weapons handling devices, damage control automation systems and components will reduce the ship's crew and costs.作者: 克里斯Chris 時間: 07-9-4 18:56
武器舊聞:
布希號航空母艦(PCU George H.W. Bush CVN-77,PCU是未就役單位Pre Commissioning Unit之意)是還在建造中的美國尼米茲級核動力航空母艦第十號艦之預計艦名。在2002年12月9日正式授與布希號艦名的這艘航空母艦將會是尼米茲級一系列共十艘的航艦中最後的一艘,該艦自2001年起由諾斯洛普·格拉門(Northrop Grumman)擁有的維吉尼亞州紐波特紐斯造船廠(Newport News Shipbuilding)負責建造,耗資45億美元,新艦預計在2008年時會正式加入艦隊服役。
已卸任的前美國總統喬治·赫伯特·沃克·布希(George Herbert Walker Bush)是美國第41任總統,同時也是第二次世界大戰時美國海軍的魚雷轟炸機飛行員(服役期間為1942年8月至1945年9月)。布希在滿18歲的生日當天加入了美國海軍,並且在尚未年滿19歲時就正式被授與任務成為真正的海軍飛行員,派駐到聖哈辛托號航空母艦(USS San Jacinto CVL-30),是當時最年輕的海軍飛行員之一。他曾在1944年一場日本小笠原群島(おがさわらぐんとう)的海戰中,在父島(ちちじま)附近遭到日軍炮火擊落,但幸運地被救起。因此,布希可說是全世界第一位曾真正在航空母艦上服役過的航艦命名被提名人。