Program Status
The focus of the program is producing effectiveness at an affordable price—the Air Force’s unit flyaway cost objective is $28 million (FY94$). This unit recurring flyaway cost is down from a projected, business as usual,cost of $36 million. The Concept Demonstration Phase (CDP) was initiated in November 1996 with the selection of Boeing and Lockheed Martin. Both contractors are: (1) designing and building their concept demonstration aircraft, (2) performing unique ground demonstrations, (3) developing their weapon systems concepts. First operational aircraft delivery is planned for FY08.
The JSF is a joint program with shared acquisition executive responsibilities. The Air Force and Navy each provide approximately equal shares of annual funding, while the United Kingdom is a collaborative partner, contributing $200 million to the CDP. CDP, also known as the Program Definition and Risk Reduction (PDRR) phase, consists of three parallel efforts leading to Milestone II and an Engineering and Manufacturing Development (EMD) start in FY01:
Concept Demonstration Program. The two CDP contracts were competitively awarded to Boeing and Lockheed Martin for ground and flight demonstrations at a cost of $2.2 billion for the 51-month effort, including an additional contract to Pratt & Whitney for the engine. Each CDP contractor will build concept demonstrator aircraft (designated X-32/35). Each contractor will demonstrate commonality and modularity, short take-off and vertical landing, hover and transition, and low-speed carrier approach handling qualities of their aircraft.
Technology Maturation. These efforts evolve key technologies to lower risk for EMD entry. Parallel technology maturation demonstrations are also an integral part of the CDP / PDRR objective of meeting warfighting needs at an affordable cost. Focus is on seven critical areas: avionics, flight systems, manufacturing and producibility, propulsion, structures and materials, supportability, and weapons. Demonstration plans are coordinated with the prime weapon system contractors and results are made available to all program industry participants.
Requirements Definition. This effort leads to Joint Operational Requirements Document completion in FY00; cost/performance trades are key to the process. |
|