- 鐵幣
- 26461 元
- 文章
- 11533 篇
- 聲望
- 11136 枚
- 上次登入
- 19-10-17
- 精華
- 175
- 註冊時間
- 05-12-25
- UID
- 215856
|
TEST & EVALUATION ASSESSMENT
With DOT&E encouragement, the Navy greatly expanded the scope of OT-IIC to get better insight into the effectiveness and suitability of the EMD design. The results, while not yet conclusive regarding the potential operational effectiveness and suitability of operational aircraft, were encouraging. The six phases of the OT-IIC Assessment included: (1) shipboard assessment, (2) maintenance demonstrations, (3) tactical aircraft employment via FSD aircraft and manned flight simulator, (4) operational training plans, (5) program documentation review, and (6) software analysis.
In assessing the operational effectiveness and suitability COIs, COMOPTEVFOR and AFOTEC found that in most cases, only moderate risk exists that the COIs will not be satisfactorily resolved when development is complete. Enhancing features observed during OT-IIC included aircraft payload, range and speed characteristics better than the stated operational requirements. In addition, reliability, availability and maintainability of the EMD aircraft appeared to be significantly improved over those of the FSD aircraft.
Several areas of concern first discovered in OT-IIA or OT-IIB remain unresolved because of limitations to the EMD flight test operations. These concerns include severe proprotor downwash effects during personnel insertion and extraction via hoist or rope. In addition, concerns exist in the areas of communications, navigation , and crew field of view. New concerns arising from OT-IIC regarding the EMD schedule are being addressed by the program manager. Also, the reliability and maintainability of a few subsystems will require management attention. Despite these concerns, the V-22 design remains potentially operationally effective and suitable.
The aircraft's prime contractors include Boeing Company's helicopter division in Ridley Park, PA, and Bell Helicopter Textron of Fort Worth TX.
In 1986 the cost of a single V-22 was estimated at $24 million, with 923 aircraft to be built. In 1989 the Bush administration cancelled the project, at which time the unit cost was estimated at $35 million, with 602 aircraft. The V-22 question caused friction between Secretary of Defense Richard B. Cheney and Congress throughout his tenure. DoD spent some of the money Congress appropriated to develop the aircraft, but congressional sources accused Cheney, who continued to oppose the Osprey, of violating the law by not moving ahead as Congress had directed. Cheney argued that building and testing the prototype Osprey would cost more than the amount appropriated. In the spring of 1992 several congressional supporters of the V-22 threatened to take Cheney to court over the issue. A little later, in the face of suggestions from congressional Republicans that Cheney's opposition to the Osprey was hurting President Bush's reelection campaign, especially in Texas and Pennsylvania where the aircraft would be built, Cheney relented and suggested spending $1.5 billion in fiscal years 1992 and 1993 to develop it. He made clear that he personally still opposed the Osprey and favored a less costly alternative.
The program was revived by the incoming Clinton administration, and current plans call for building 458 Ospreys for $37.3 billion, or more than $80 million apiece, with the Marines receiving 360 Ospreys, the Navy 48 and the Air Force 50. The first prototype flew in 1989. As of early 2000 three test aircraft had crashed: no one was killed in the 1991 crash, an accident in 1992 killed seven men, and the third in April 2000 killed 19 Marines. |
|