- 鐵幣
- 26461 元
- 文章
- 11533 篇
- 聲望
- 11136 枚
- 上次登入
- 19-10-17
- 精華
- 175
- 註冊時間
- 05-12-25
- UID
- 215856
|
續:
The President signed the FY74 Appropriations Authorization Act providing funds for the first TRIDENT submarine on 15 November 1973, and on 25 July 1974 the Navy awarded a fixed-price incentive contract to General Dynamics, Electric Boat Division, for construction of this first TRIDENT SSBN.
In 1974 the initial Ohio program was projecte to consist of 10 submarines deployed at Bangor Washington carrying the Trident-1 C-4 missile. By 1981 the program had been modified to include 15 boats, and at least 20 boats were planned by 1985. In 1989 the Navy anticipated a total fleet of at least 21 boats, while plans the following year envisioning a total of 24 boats, 21 of which would carry strategic missiles with the remaining three supporting other missions, such as special forces. However, in 1991 Congress directed the termination of the program with the 18th boat, citing anticipated force limits under the START-1 arms control agreement and the results of the Bush Administration's Major Warship Review, which endorsed capping the program at 18 boats.
The first eight Ohio class submarines (Tridents) were originally equipped with 24 Trident I C-4 ballistic missiles. Beginning with the ninth Trident submarine, USS Tennessee (SSBN 734), all new ships are equipped with the Trident II D-5 missile system as they were built, and the earlier ships are being retrofitted to Trident II. Trident II can deliver significantly more payload than Trident I C-4 and more accurately. All 24 missiles can be launched in less than one minute.
Ohio-class/Trident ballistic missile submarines provide the sea-based "leg" of the triad of U.S. strategic offensive forces. By the turn of the century, the 18 Trident SSBNs (each carrying 24 missiles), will carry 50 percent of the total U.S. strategic warheads. Although the missiles have no pre-set targets when the submarine goes on patrol, the SSBNs are capable of rapidly targeting their missiles should the need arise, using secure and constant at-sea communications links.
The Clinton Administration's Nuclear Posture Review was chartered in October 1993, and the President approved the recommendations of the NPR on September 18, 1994. As a result of the NPR, US strategic nuclear force structure will be adjusted to 14 Trident submarines -- four fewer than previously planned -- carrying 24 D-5 missiles, each with five warheads, per submarine. This will require backfitting four Trident SSBNs, currently carrying the Trident I (C- 4) missile, with the more modern and capable D-5 missile system. Under current plans, following START II's entry into force, the other four SSBNs will either be converted into special-purpose submarines or be retired.
SSBN 726 Class Submarine shipboard equipment which requires significant maintenance during the planned operating cycle, industrial level maintenance, which is beyond the capability of Ship's Force, and which cannot be accomplished during the refit period (without unacceptable impact on other refit requirements), is supported by TRIDENT Planned Equipment Repair (TRIPER) program. TRIPER equipment is removed from the ship for refurbishment ashore, replaced with pre-tested, Ready for Issue units and the affected system restored to full operational condition prior to completion of the refit period. Replacement is accomplished on a planned basis at intervals designed to preclude the failure of the equipment or significant degradation of its associated system. |
|